Long-range capital plan

long-range cap·i·tal plan noun

The short answer

The 10-to-20-year roadmap of major property investments beyond the reserve study's floor.

Also called capital master plan

Last reviewed . Sources Cite this entry

Read this as Shaded sections change with your choice

Definition

The forward capital map that extends past the reserve study’s replace-what-exists mandate into what the property should become: repositioning investments, amenity additions, accessibility and energy projects, technology infrastructure, each roughly priced and sequenced across decades. The reserve study funds the property’s survival; the capital plan designs its future, and together they tell owners the whole physical truth. It pairs with the strategic plan as its priced, physical half.

Why it matters to board members

Why it matters to resort teams

Reserve studies keep the roof on but never decide whether the property should have a fitness center, better wifi or a new identity. Without the capital plan, the future gets decided by whichever component fails next.

The capital plan is where operations knowledge becomes a document. The manager knows the wifi complaints, the accessibility gaps, the kitchen that cannot handle the rental program and the energy bill a retrofit would cut. None of that is in the reserve study, because none of it exists yet. Write it down with a rough number and a decade, sequenced around the reserve study's replacement cycle so a new roof and a new rooftop deck happen once, not twice. Update it every year with the reserve study and present both together.

"The study replaces the 1985 resort forever. The capital plan is where we decided to build the 2035 one."

A treasurer, presenting the reserve study and capital plan together

The question board members should ask

The question resort teams should ask

"Beyond replacing what exists, is there a priced map of what this property should become?"

"Is there a written list of what the property needs that the reserve study cannot fund, with a rough price and a year on each line?"

Where each answer leads

  1. Map exists

    The future has a budget. Sync it with each reserve study update.

  2. Survival-only planning

    One planning cycle drafts it from the strategic plan's property goals.

  3. Wish list, unpriced

    Rough pricing converts wishes into a sequence; do that pass.

Not to be confused with

The capital plan designs the property's future. The reserve study funds the survival of its present.

Sources

This entry explains a term in general use and cites no single source. How Timesharica sources its work

A reserve study answers what will break. Only the board can answer what the property should become.

Quorum, Capital projects and the engineer in the room chapter (candidate line, not yet in manuscript)

Cite this entry

Title
Long-range capital plan
Entry
214
Link
https://www.timesharica.com/glossary/long-range-capital-plan/
Last reviewed
Aug. 30, 2026

"Long-range capital plan." Timesharica glossary, entry 214. https://www.timesharica.com/glossary/long-range-capital-plan/. Last reviewed Aug. 30, 2026.

Go to Top