Capital expenditure
cap·i·tal ex·pend·i·ture noun
The short answer
Spending that buys or replaces a major long-lived asset.
Also called capex
Last reviewed . Sources Cite this entry
Definition
Spending on assets with a useful life of more than a year: a new roof, an elevator modernization, a renovated lobby, a replacement HVAC plant. Capital spending is what reserves exist to fund, as opposed to operating expenses which keep the lights on. The distinction matters for budgeting, for accounting and for honesty, because reclassifying capital work as repairs, or the reverse, is one of the classic ways a struggling budget hides what is actually happening.
Why it matters to owners
Why it matters to board members
Why it matters to resort teams
When the resort replaces something big, the money should come from reserves, because that is what reserves were saved for. When it repairs something, the money comes from this year's operating budget. The line between the two decides whether your fee absorbs the cost or the reserve account does, and whether the project was planned or a surprise. When a project is announced, ask which it is and whether the reserve study already saw it coming.
Boards approve capital projects rarely and remember them forever. Knowing which bucket a cost belongs in keeps the reserve study accurate, the audit clean and the owner explanation honest.
Classification is an accounting decision with a fee consequence. Write the capitalization policy down: the dollar threshold, the useful-life test and who signs off. Tag every capital project to its component in the reserve study, record actual cost against the study's estimate and feed the difference back to the analyst at the next update. A project that is not in the study is either a new component or a repair misfiled as capital, and either one needs a note.
"Patching the roof is operating. Replacing it is capital, and it comes from reserves, which is why reserves exist."
The question owners should ask
The question board members should ask
The question resort teams should ask
"Is this project a repair paid from this year's budget or a replacement paid from reserves, and was it already in the reserve study?"
"Is this project a repair from operating or a replacement from reserves, and does the study already anticipate it?"
"Is the capitalization policy written, is every capital project tagged to a study component and is actual cost fed back to the analyst?"
Where each answer leads
-
In the study, funded
Proceed with bids. This is the system working as designed.
-
Capital but not in the study
Tell the analyst so the next update includes it. Surprise components break funding plans.
-
Classification unclear
Ask the CPA once and write the rule down. Consistency matters more than the choice.
Not to be confused with
Deferred maintenance is capital work that was due and skipped. Capex is doing it on purpose.
Sources
This entry explains a term in general use and cites no single source. How Timesharica sources its work
Reserves exist for the day the roof stops being a repair.