The reserve study arrives as a thick document full of tables, and it is easy to read the summary page and stop. That is a mistake, because the study is the document that says what the association will have to pay for over the next few decades and whether it is saving enough to do it. Owners can read it too, and this article is written so they can.
The terms below come from the National Reserve Study Standards, which the Community Associations Institute publishes so reserve study providers and the associations they serve work from one set of terms.1 The seven questions at the end come from chapter 8 of Quorum, Timesharica’s book for boards.
What a reserve study is
A reserve study is a budget planning tool. It identifies the parts of the property the association is responsible for maintaining or replacing, reports the current status of the reserve fund and recommends a stable and equitable funding plan for the major costs ahead.1 The industry’s own association, the American Resort Development Association, defines it more simply as a plan that predicts when capital items will wear out and estimates the funds to set aside for them.2
Every study has two halves. The physical analysis covers what the property contains and what shape it is in. The financial analysis covers where the reserve fund stands and what the association should contribute.1
The physical analysis: what the building holds
The component inventory is the list of every reserve component, with its quantity. To make the list, a component has to pass a four-part test: the association is responsible for it, it has a limited useful life, its remaining life can be predicted and its cost is above a minimum threshold.1 Anything that fails the test is paid from the operating budget instead.
For each component the study gives three numbers. Useful life is how long the component can be expected to serve when properly installed. Remaining useful life is how many years it has left, and a project expected this year has a remaining life of zero. Replacement cost is what it would cost to replace or restore the component this year, including engineering, permits, installation and disposal.1
Sample component line
- Component: {name and quantity}
- Useful life: {years}
- Remaining useful life: {years}
- Current replacement cost: {amount}
- Fully funded balance: {amount}
- Passes the four-part test, or it belongs in the operating budget.
- How long it lasts when properly installed.
- Zero means the project is due this year.
- Includes engineering, permits, installation and disposal.
- Cost times effective age, divided by useful life.
Resorts reported typical lives to ARDA for the items that turn over fastest. Electronics, soft goods and paint last about six to seven years, appliances and case goods about 11, heating and cooling equipment about 13 and tile, cabinetry and plumbing fixtures about 20.2
The financial analysis: where the money stands
The fund status tells you where the reserve fund stands, in cash and as percent funded.1 Percent funded compares the actual reserve balance with the fully funded balance, which is the share of each component’s replacement cost that its age has already used up, added together across the property.
The standards give a simple example. A component that costs $10,000 to replace, with a 10-year useful life and an effective age of four years, has a fully funded balance of $4,000.1 ARDA’s glossary uses a roof: if replacement costs $50,000 and the roof is halfway through its life, the reserve should hold $25,000 for it.2 An association holding half of its fully funded balance is 50 percent funded.
The standards also warn against reading the number alone. Percent funded should be judged by how it is changing under the funding plan and against the association’s tolerance for risk.1 By that standard, a rising 50 percent can tell a better story than a falling 70.
The funding plan and its goal
The funding plan is the schedule of contributions the study recommends. The 2016 standards require at least 20 years of projections,1 and CAI’s 2025 explanation of the standards calls for at least 30.3 Look for the table that shows, year by year, the starting balance, the contributions, the expenses and the ending balance.
Every plan aims at a goal, and CAI recognizes four. Three are ranked by risk, from greatest to least: baseline funding keeps the balance above zero, threshold funding keeps it above a set dollar amount or percent funded and full funding aims at about 100 percent funded. The fourth, statutory funding, sets aside whatever minimum a local law requires.1 The study should say which goal it uses, and the board should be able to say why it chose that one.
How a study goes stale
The standards describe a full study, an update with a site visit and an update without one. The last re-estimates lives, costs and funding but doesn’t look at the property, and it treats the component list from the earlier study as accurate.1 Check the cover page for the level of service and the date of the last full study.
Levels of service
- FullCounts every component and inspects the property
- Update with site visitChecks the list and inspects the property
- Update without site visitRe-estimates lives, costs and funding without looking at the property
Read the disclosures, too. A study must state the interest and inflation rates it assumes, any other work the provider does for the association that could present a conflict and that the reserve balance it reports was supplied by the association and not audited.1 Quorum’s rule of thumb is that a study more than five years old with no refresh scheduled is an action item. The article on the five patterns of quiet underfunding shows what happens when it isn’t.
If the resort is in Florida
Florida’s post-Surfside laws added milestone structural inspections for older condominium buildings and structural integrity reserve studies every 10 years, and they bar waiving reserves for the components those studies cover in budgets adopted on or after Dec. 31, 2024.4 ARDA-ROC and the Timeshare Board Members Association say the laws reach timeshare condominiums.5 Ask counsel how the structural study and the regular reserve study fit together for your resort.
Seven questions to bring to the meeting
The questions below are Quorum’s, lightly updated to name all four funding goals. A board that can answer them has the reserve picture in hand. A board that can’t has found its next agenda.
Seven reserve questions
From Quorum, chapter 8. Every director should be able to answer them in a sentence.
- When was the last full study, and when is the next refresh due?
- More than five years with nothing scheduled is an action item
- Which funding goal does our plan use?
- Baseline, threshold, full or statutory, and why we chose it
- What is our current funded position?
- In dollars and as percent funded
- How has actual funding compared with planned over three to five years?
- Tracking, lagging or leading, and by how much
- What are the next major capital events, and is the funding adequate?
- Three to five years out, with dollar figures
- Are operating-to-reserve transfers documented and on plan?
- Or covering shortfalls without a board vote
- What do our state law and our documents require?
- Ask counsel for the list
Checked on ____________. Recheck each year when the budget arrives.