ModernizeVolume VEntry 169
Preventive maintenance system
pre·ven·tive main·te·nance sys·tem noun
The short answer
The system that schedules upkeep before things break instead of after.
Also called CMMS
Last reviewed . Sources Cite this entry
Definition
The organized practice, usually software, of scheduled maintenance: recurring work orders for HVAC service, seal inspections and equipment care, asset histories that record every repair and reports showing what is aging badly. Preventive maintenance is cheaper than reactive repair in parts, labor and guest disruption, and its asset histories become gold at reserve study time, replacing an analyst’s guesses about equipment condition with documented fact.
Why it matters to board members
Why it matters to resort teams
Run-to-failure is the most expensive maintenance strategy and the default one. A CMMS converts the maintenance operation from firefighting into scheduling, and its records feed the reserve study honest data.
The system is only as good as the asset list you load into it. Start with the components the reserve study names, add the equipment that fails most and build recurring work orders on the manufacturer's service interval. Log every repair against the asset, not against the unit, so the history follows the equipment. Pull two reports for the board each quarter: work orders completed on schedule against reactive calls, and the assets with the most repair spend, because the second list is the replacement list. Hand the full history to the reserve analyst before the next site visit.
"The chiller log shows every service since 2019. The reserve analyst stopped guessing and just read it."
The question board members should ask
The question resort teams should ask
"Is our maintenance scheduled and logged, or dispatched by whatever broke this morning?"
"Which assets are loaded in the system, what share of last quarter's work orders were scheduled rather than reactive and has the history gone to the reserve analyst?"
Where each answer leads
-
Scheduled and logged
Firefighting retired. Share asset histories at study updates.
-
Reactive mode
Start with the 10 most expensive assets on a recurring calendar.
-
Logs exist on paper
Even a spreadsheet CMMS beats memory; digitize the top assets first.
Not to be confused with
Preventive maintenance protects assets on schedule. Deferred maintenance is what accumulates without it.
Sources
This entry explains a term in general use and cites no single source. How Timesharica sources its work
Run-to-failure is a strategy. It is the most expensive one, and it is chosen by default.





