Milestone inspection
mile·stone in·spec·tion noun
The short answer
Florida's mandatory structural inspection for aging taller buildings.
Last reviewed . Sources Cite this entry
Definition
A Florida-mandated structural inspection by a licensed engineer or architect for condominium and cooperative buildings 3 stories or higher, triggered by building age, generally at 30 years and on a recurring cycle after, with earlier triggers in some coastal areas. Phase one is a visual assessment; findings of substantial deterioration trigger a deeper phase two and required repairs. Applicability, timing and local variations involve statutory detail, so Florida boards should confirm their schedule with counsel and calendar it years ahead, because the inspection’s findings feed directly into reserve planning.
Why it matters to board members
Why it matters to resort teams
This inspection turns building age into a legal deadline with an engineer's findings attached. Boards that calendar it early control the timeline and the narrative. Boards that discover it late fund phase two repairs on the statute's schedule instead of their own.
The inspection has a short lineage worth knowing by name. In May 2022, 11 months after the Champlain Towers South collapse in Surfside, Florida passed SB 4-D (ch. 2022-269, Laws of Fla.), which wrote the milestone inspection into § 553.899 and tied it to building age. SB 154 (ch. 2023-203, Laws of Fla.) followed in June 2023 and moved the triggers: 30 years as the general rule, with local governments allowed to set 25 years for buildings within 3 miles of the coast. The industry's own association, ARDA-ROC, has worked both bills for timeshare-specific treatment, so the schedule that reaches a timeshare association can differ from the condominium schedule. When an engineer quotes a deadline, ask which bill's version it comes from.
The inspection is a date with a report attached. Confirm the trigger date with counsel from the certificate of occupancy, put it on the board calendar years ahead, budget the engineer's fee in the year before it is due and be ready for a phase two. Feed the report into the reserve study at the next update, because a milestone finding that is not in the component list is a special assessment that has not been named yet.
"Our building turns 30 in 2029, so the milestone inspection goes on the calendar now, not in 2029."
The question board members should ask
The question resort teams should ask
"When is our milestone inspection due, and is that date written in the board calendar and the reserve plan?"
"Is the milestone trigger date confirmed with counsel, on the board calendar and budgeted, and does the last report feed the reserve study?"
Where each answer leads
-
Calendared and pre-funded
Ahead of the statute. Share the timeline with owners before rumor does.
-
Date unknown
Confirm the building's trigger date with counsel this quarter. The clock is running either way.
-
Inspection found issues
Phase two findings become the reserve plan's new spine. Update the study immediately.
Not to be confused with
SIRS is the funding study for structural components. The milestone inspection is the physical exam that may demand them sooner.
Sources
State statutes are cited in the By state panel.
This entry summarizes statutes that differ from state to state and change often. It is general information, not legal advice. Confirm how it applies to your association with your own counsel before acting on it.
The building turns 30 on a date the county already knows. The inspection belongs on the calendar the same day.